At 3 meters from Julen, the boy from the well of Totalán (Málaga), the live rescue



[ad_1]

García Vidal, in a press conference, said she was in contact with the experts of
rescue Miner who, precisely, this Monday climbed on the spot to finalize the details of the whole operation, "even though we have seen him countless times in these last days". However, he said, "we do not want to leave any details or pending conclusions, that's why they went up."

However, he said, "we do not want to leave any details or pending conclusions, that's why they went up."

They will descend into the capsule of
rescue, 1.05 meters in diameter by 2.5 meters in height, designed by the technical director of firefighters provincial of Malaga, Julián Moreno, and manufactured by smiths of the municipality of Alhaurín de la Torre in Malaga.

Therefore, if everything goes well this afternoon, the work of drilling the horizontal tunnel that should facilitate the
rescue of
Julen.

This means, according to the engineer, having used a speed of 1.1 meters at the time.

As reported by the coordinator of the device, Ángel García Vidal, the miners will start with the horizontal tunnel after reaching 60 meters from the vertical they have practiced in parallel to the
well where the youngest fell

[ad_2]
Source link