[ad_1]
Construction of the Tesla Giga Berlin in Germany is proceeding rapidly on all fronts simultaneously. The first buildings should be close to completion by the end of the year, we assume.
One of the latest innovations is the red bridge crane, with the Tesla logo, installed in the fusion plant. It should be able to collect 100 tons, according to the description:
Tesla Giga Berlin (source: the_wolfpack_berlin)
As we can see in the video (and images) recorded by the_wolfpack_berlin, all the buildings are advancing:
Tesla Giga Berlin – Paint shop (source: the_wolfpack_berlin)
Tesla Giga Berlin – Stamping (source: the_wolfpack_berlin)
Tesla Giga Berlin – Casting (source: the_wolfpack_berlin)
Tesla Giga Berlin – Body in white (source: the_wolfpack_berlin)
Tesla Giga Berlin – Drive Unit (source: the_wolfpack_berlin)
Tesla Giga Berlin – General Assembly (source: the_wolfpack_berlin)
Tesla Gigafactory 4 (aka Tesla Giga Berlin) at a glance:
Source link